From design to installation: how does a project with Aran work?

When a company is considering a new tank, skid, or process piping system, the technical questions quickly arise. But another question is equally important: How will the project actually unfold?

For a plant manager, an engineer or a project manager, this visibility is essential. It is necessary to know how to move from an operational need to manufactured and installed equipment, what information to prepare and at what times important decisions must be made.

Aran designs, manufactures and installs customized stainless steel equipment and systems. Depending on the project, this can include tanks, process and utility piping, skids, platforms, walkways or other equipment tailored to the customer’s needs.

The advantage of a project management approach that covers several stages of the project is simple: the design must take into account from the outset what will actually have to be manufactured and installed on site.

Here are the major milestones you can expect.

1. Understand the need before talking about manufacturing

A project begins with a need, not with stainless steel.

Before determining how to manufacture a tank or install a new process line, it is necessary to understand what the equipment will have to accomplish.

What product will circulate in the system? What capacity is required? At what temperatures and pressures will the process operate? How will the equipment be cleaned? What will it need to be connected to? What are the space and access constraints in the plant?

The answers allow defining the technical parameters of the project.

In an food, pharmaceutical, cosmetic or chemical environment, it is also necessary to consider the health or regulatory requirements applicable to the process.

This first step is mainly intended to avoid a costly mistake: to design equipment that works on paper but does not correspond to the realities of the factory.

The more precise the information is at the outset, the more possible it becomes to devise a solution tailored to the real need.

2. Transforming a need into a technical solution

Once the needs and constraints are understood, the project moves on to design.

It is at this stage that the various requirements must begin to form a coherent whole.

The system must obviously fulfill its function as a process, but it must also be able to be manufactured, installed, cleaned, and maintained.

The design may in particular have to take into account the available space, the layout of existing equipment, the necessary connections, the materials, the piping, the valves and the instrumentation depending on the nature of the project.

It is also at this stage that an important choice can be made: Which part of the system should be preassembled in the workshop and which part should be carried out directly on site?

For some projects, a pre-assembled skid can reduce on-site work. For others, installation directly in the factory provides the necessary flexibility to adapt to an existing environment.

There is therefore no ideal configuration for all projects.

The design must serve the process, not the other way around.

3. Anticipate installation from the design stage

Installing it should not be an issue once the equipment is already manufactured.

It should be considered much earlier.

Can a tank enter the building? Can a skid be transported to its final location? Does the space allow for connections to be made? Does the new piping have to bypass existing equipment? Will some work need to be carried out during a planned shutdown?

These are very concrete considerations, but they can have a major impact on the timeline.

A perfectly designed system that cannot be installed easily quickly becomes a problem.

Considering the terrain during design therefore reduces last-minute adjustments and better prepares the installation phase.

4. Moving from design to manufacturing

Once the solution is defined, production can begin.

According to the project, Aran can manufacture custom-made tanks, manifolds, spools, skids, and other industrial equipment.

It is here that the plans become real equipment.

Manufacturing may involve different expertise depending on the needs of the project, including TIG welding, orbital welding, and piping work.

For sanitary equipment or applications where surface quality is important, the finish must also be adapted to the intended requirements.

This step is particularly important because the final quality of a process system depends as much on its design as on its execution.

A good concept must be able to be reproduced accurately in the workshop and then on the field.

5. Preassemble when the project allows for it

Not everything needs to be built directly in the factory.

When a project lends itself to this, certain parts can be pre-assembled in the workshop. This is the principle of a skid: grouping equipment, piping and instrumentation together on a structure before delivery.

This approach can present an important advantage in terms of timing.

While the module is being manufactured, some preparatory work can be carried out on the customer’s site. Part of the project therefore proceeds without monopolizing the production space.

Preassembly can also reduce the amount of work that needs to be done once the equipment arrives at the factory.

But this is not an absolute rule. The size of the equipment, access, the configuration of the building, and the connections to the existing process determine what can actually be preassembled.

In some cases, a hybrid approach combining in-house manufacturing and fieldwork is more relevant.

6. Prepare for arrival at the site

Manufacturing is only one part of the project.

Before installation, it is also necessary to ensure that the site is ready to receive the equipment and that the various operations can be coordinated with the operations of the factory.

This preparation is particularly important when an installation is to be carried out in an already operating plant.

The goal is to limit surprises when the teams arrive on the field.

The constraints of access, the location of the equipment, the necessary connections, and the work to be carried out on-site must have been considered sufficiently early.

When a planned stop is necessary, coordination becomes even more important: each intervention must contribute to using the available window effectively.

7. Install and integrate the system

Once the equipment is ready and the site is prepared, the project moves on to installation.

Aran has mobile teams that can work on projects across Canada and, in particular, installs process and utility piping systems on site.

This step involves integrating the equipment into its real environment.

According to the project, this may include the positioning of the equipment, the installation of the piping, and the various connections required for the system.

It is also at this point that the preparation carried out in advance takes on its full importance.

The more the site’s constraints are anticipated, the less the team has to solve unforeseen problems during the installation.

8. How long should I plan to spend?

This is probably one of the first questions a project manager asks himself.

And the most useful answer is also the most transparent: There is no single timeframe applicable to all projects.

A custom tank, a complete skid and a modification of the piping in an existing plant do not present the same level of complexity.

The timeline depends, in particular, on the scale of the project, the required design, the level of manufacturing, the constraints of the site, and the scale of the installation work.

That is why it would be misleading to promise a universal number of weeks before having analyzed the project.

On the other hand, some early decisions can facilitate the timeline: providing precise information about the process, quickly identifying access constraints, determining applicable requirements, and deciding which parts can be manufactured in the workshop.

What the client can prepare to facilitate the project

A customized project is a collaborative effort.

Before the first discussions, it may therefore be useful to gather as much information as possible about:

  • the product or liquid in question;
  • the capacity and parameters of the process;
  • the operating temperatures and pressures;
  • the cleaning requirements;
  • the existing equipment to which the new system will have to be connected;
  • the available space;
  • the constraints on access to the factory;
  • the specific standards or requirements of the project;
  • the desired timeline for production.

Not everything needs to be perfectly defined from the very first exchange.

But the clearer the initial portrait is, the easier it is to quickly identify the constraints and decisions that will have an impact on the project.

An integrated project, from design to the field

A stainless steel process design is not just about manufacturing a tank or welding together sections of piping.

Design influences manufacturing. Manufacturing influences installation. The site environment influences all three.

That is why it is useful to consider the project as a whole from the outset.

Aran intervenes in the design, manufacture and installation of stainless steel systems and equipment, with specialized teams able to work in the workshop as well as on site.

For the client, the objective is simple: transitioning from an operational need to an installed system by minimizing the number of unexpected events between the different stages as much as possible.

The best starting point, therefore, is not necessarily arriving with a solution that is already completely defined.

It is about arriving with a clear understanding of the need, the constraints and the expected outcome. The technical solution can then be built around this reality.

Discover more articles

Modular skid vs custom installation: which option speeds up your production launch?

Modular skid or custom installation? Timelines, downtime costs, access and space: questions to ask to speed up your…

Stainless steel tank: 5 signs that it’s time to replace yours

Corrosion, cracks, repeated repairs: discover 5 signs that an stainless steel tank needs to be repaired or replaced.